ADU Surveys in San Pablo, CA

We provide ADU surveys in San Pablo, Contra Costa County — metes-and-bounds site plans under a city rule that says it directly: if property lines and structure locations are not known, a professional survey may be required.

ADU Surveys in San Pablo: Local Conditions

San Pablo streamlined its ADU process in mid-2026 — applications now go straight to the Building Division without separate planning approval — but the site-plan standard underneath is exacting. The city's residential site plan handout requires applicants to "accurately and clearly specify metes, bounds, and other legal site lines (such as easements)," with setback lines for all structures, dimensions between structures, utility laterals plotted, and drainage engineered on paper: 5 percent fall away from the building for the first 10 feet and 2 percent positive drainage to the street. And the handout answers the survey question in its own underlined words: if property lines and structure locations are not known, a professional survey of the site may be required. On San Pablo's compact early-20th-century lots — hemmed in on every side by Richmond and layered with a century of fences, additions, and shared driveways — "not known" describes most parcels honestly.

East of Interstate 80, the requirements step up: the city requires a geotechnical report for all development — construction, grading, even tree removal — on that side of the freeway, reflecting the soil conditions and the Hayward fault's proximity along the hills. That makes the east-side ADU a three-document project from day one: surveyed site plan, soils report, and building plans that reconcile the two. San Pablo ADUs also collect outside-agency stamps before plan check — fire district for any new construction, West County Wastewater for any added fixtures, and the school district, whose fees apply to ADUs. Our laser-scanned site survey anchors the sequence: boundary resolved to metes-and-bounds standard from county records, structures and laterals mapped, drainage grades measured against the 5-and-2-percent standard, and staked corners that support the surveyor form verification inspectors frequently require before the foundation pour.

Records run through the Contra Costa County Recorder in Martinez. Deliverables are a stamped base map, layered DWG, and staked corners; for drainage- and slope-led questions see our San Pablo topographic surveys.

Full service details, process, and deliverables: ADU Surveys & Site Plans for Permit Applications · All surveying in San Pablo: San Pablo land surveying

What's Included

  • Scaled site plan base map matching city ADU checklists
  • Boundary verification — 4-ft setbacks measured from the true line, not the fence
  • Property corners staked for design and construction
  • 1-foot contours and drainage data for sloped lots
  • Easement and utility locations from record research
  • CAD-ready DWG base file your designer builds on directly
  • Foundation form verification when the inspector requires it

Our Process

1

Checklist Review

We confirm your city's ADU submittal requirements — site plan content, survey triggers, slope and drainage items — so the survey is scoped to what plan check will actually ask for.

2

Boundary & Records Research

We research your deed, recorded maps, and easements, then locate existing monuments to establish where your property lines actually are.

3

Site Survey

One laser-scanned site visit captures structures, hardscape, trees, utilities, and terrain — spot elevations and contours included where the lot slopes or the city requires them.

4

Deliverables

You receive a stamped site plan base map and layered DWG file sized to your city's checklist, with property corners staked on the ground for your designer and builder.

ADU Surveys in San Pablo: FAQ

Conditionally, in its own words: the city's site plan handout states that if property lines and structure locations are not known, a professional survey of the site may be required — and the plan itself must specify metes, bounds, and legal site lines including easements. On San Pablo's dense older lots, a surveyed base map is usually the only honest way to meet that standard.
San Pablo requires a geotech report for all development east of Interstate 80 — construction, grading, and even tree removal — due to soil conditions and the Hayward fault's proximity. If your parcel is on that side, budget the soils report alongside the survey; the geotechnical engineer works from the surveyed base we deliver.
The handout requires the plan to demonstrate 5 percent fall away from the building for the first 10 feet and 2 percent positive drainage to the street, with swales where needed. Those are measured-grade questions on flat lots — our scan captures dense spot elevations so the drainage scheme on your plan reflects the ground rather than hope.

Need ADU Surveys in San Pablo?

Call (510) 543-2220 or request a quote — we'll scope your San Pablo project and give you a fixed price.

Meeting-first estimates • Response within 24 hours • Serious projects only