ADU Surveys in Hercules, CA

We provide ADU surveys in Hercules, Contra Costa County — where city planning approval hands off to county building review, bringing the county's slope-triggered geotechnical rules with it.

ADU Surveys in Hercules: Local Conditions

Hercules runs a two-desk ADU process: planning approval comes from the city, but building permits and inspections run through Contra Costa County, which provides building services to Hercules. That handoff matters, because it imports the county's submittal framework — site plans with property lines and dimensions, easements, water and sewer line locations for detached units, and trees over 20 inches in circumference within 50 feet of construction — along with the county's geotechnical trigger: a report may be required where the site slopes more than 5 percent, one foot of fall across the ADU footprint, with exemptions only on gentler, trouble-free ground. The city's own guidance notes that even pre-approved plans still need site-specific plans, foundation details, and a geotechnical report if required.

Hercules wears its history in its parcels. The old company town of the Hercules Powder Works left a small historic core near the waterfront, while most of the city's housing came in planned phases from the 1970s onward — the Birds neighborhoods, Refugio Valley's slopes, and the newer transit-village blocks near the shoreline. The planned tracts have recent, recoverable lot corners, making boundary verification efficient; the sloped streets around Refugio Valley Park are where the county's 5-percent trigger earns attention, since a modest backyard grade crosses it easily. Refugio Creek's corridor adds setback and drainage considerations for adjacent lots. Our laser-scanned site survey resolves boundary, structures, trees at the county's circumference threshold, utility locations, and slope in one visit — and where the inspector requires verification that foundation forms match the approved setbacks before the pour, the same boundary work supports the certification in a short return trip.

Records run through the Contra Costa County Recorder in Martinez. Deliverables are a stamped base map, layered DWG, and staked corners; for terrain-led questions see our Hercules topographic surveys.

Full service details, process, and deliverables: ADU Surveys & Site Plans for Permit Applications · All surveying in Hercules: Hercules land surveying

What's Included

  • Scaled site plan base map matching city ADU checklists
  • Boundary verification — 4-ft setbacks measured from the true line, not the fence
  • Property corners staked for design and construction
  • 1-foot contours and drainage data for sloped lots
  • Easement and utility locations from record research
  • CAD-ready DWG base file your designer builds on directly
  • Foundation form verification when the inspector requires it

Our Process

1

Checklist Review

We confirm your city's ADU submittal requirements — site plan content, survey triggers, slope and drainage items — so the survey is scoped to what plan check will actually ask for.

2

Boundary & Records Research

We research your deed, recorded maps, and easements, then locate existing monuments to establish where your property lines actually are.

3

Site Survey

One laser-scanned site visit captures structures, hardscape, trees, utilities, and terrain — spot elevations and contours included where the lot slopes or the city requires them.

4

Deliverables

You receive a stamped site plan base map and layered DWG file sized to your city's checklist, with property corners staked on the ground for your designer and builder.

ADU Surveys in Hercules: FAQ

Both, in sequence: the city handles planning approval, then Contra Costa County handles the building permit and inspections, since Hercules contracts building services to the county. That brings the county checklist — easements, utility locations for detached units, 20-inch-circumference trees within 50 feet — and the county's 5-percent slope geotechnical trigger into your project.
The county may require a geotechnical report where the site slopes more than 5 percent — one foot of fall across the ADU footprint — which the Refugio Valley hillside streets reach easily. Our survey measures the actual fall across the proposed site early, so the geotech question is settled with numbers before design begins.
No — the city's guidance is explicit that pre-approved plans still require site-specific plans, foundation details, and a geotechnical report where needed. The standardized part is the building; the survey supplies the site plan, verified setbacks, and slope data that make the plan permittable on your parcel.

Need ADU Surveys in Hercules?

Call (510) 543-2220 or request a quote — we'll scope your Hercules project and give you a fixed price.

Meeting-first estimates • Response within 24 hours • Serious projects only