ADU Surveys in Mill Valley, CA

We provide ADU surveys in Mill Valley, Marin County — fully dimensioned site plans, verified setbacks, finished grade for the height calculation, and creek top-of-bank mapping on canyon parcels.

ADU Surveys in Mill Valley: Local Conditions

Mill Valley's ADU handout is built around thresholds a survey answers. A new detached ADU qualifies for building permit only review when it is sixteen feet or less in height, eight hundred square feet or less in gross floor area, and set back four feet or more from the side interior and rear property lines; attached units use twenty-five feet on the same square footage and setback terms. Overall ADU height is defined as the vertical distance from finished grade at the lowest exterior wall to the highest point of the unit. A conversion stops qualifying as a conversion if it increases height or excavates more than fifty cubic yards. The building permit site plan must be fully dimensioned, showing property lines, direction of drainage, streets, driveways, locations of all structures, easements, and any off-street parking, and a deed restriction is recorded with the County of Marin.

The handout does not name a licensed surveyor, and we will not claim Mill Valley requires one. What we will say is that on these lots, four feet measured from the wrong line is the difference between a building-permit-only ADU and a discretionary application; that on a canyon slope, finished grade at the lowest exterior wall is the entire height calculation; that fifty cubic yards of excavation is a quantity you cannot estimate without existing ground; that the thirty-foot creek top-of-bank setback applies here; and that removing a tree to make room pushes the project into additional review. Inspectors also commonly want a surveyor to verify foundation forms before the pour.

One scanned visit covers it: boundary resolved from monuments and record, existing structures and the proposed footprint dimensioned to the lines, drainage direction and driveways, easements plotted, trees located, contours and finished grade where height and excavation are in play, and top of bank where a creek is near. Deliverables are a stamped, fully dimensioned site plan base map, a layered DWG, and staked corners. See our Mill Valley topographic surveys and ADU survey requirements in the Bay Area.

Full service details, process, and deliverables: ADU Surveys & Site Plans for Permit Applications · All surveying in Mill Valley: Mill Valley land surveying

What's Included

  • Scaled site plan base map matching city ADU checklists
  • Boundary verification — 4-ft setbacks measured from the true line, not the fence
  • Property corners staked for design and construction
  • 1-foot contours and drainage data for sloped lots
  • Easement and utility locations from record research
  • CAD-ready DWG base file your designer builds on directly
  • Foundation form verification when the inspector requires it

Our Process

1

Checklist Review

We confirm your city's ADU submittal requirements — site plan content, survey triggers, slope and drainage items — so the survey is scoped to what plan check will actually ask for.

2

Boundary & Records Research

We research your deed, recorded maps, and easements, then locate existing monuments to establish where your property lines actually are.

3

Site Survey

One laser-scanned site visit captures structures, hardscape, trees, utilities, and terrain — spot elevations and contours included where the lot slopes or the city requires them.

4

Deliverables

You receive a stamped site plan base map and layered DWG file sized to your city's checklist, with property corners staked on the ground for your designer and builder.

ADU Surveys in Mill Valley: FAQ

The city's ADU handout does not name a licensed surveyor, and we will not tell you it does. It does require a fully dimensioned site plan showing property lines, drainage direction, structures, easements, and parking, and it hangs building-permit-only review on a four-foot setback from the property line and a sixteen-foot height from finished grade. Those are survey measurements, so starting an ADU with a comprehensive survey is the practical path.
Overall ADU height is the vertical distance from finished grade at the lowest exterior wall to the highest point of the unit. On a sloping canyon lot the lowest exterior wall can be several feet below the entry side, so a design that looks like sixteen feet from the street can fail. We survey grade around the proposed footprint so your designer works from measured elevations.
No structures are permitted within thirty feet of the top of bank of Warner Canyon, Corte Madera, Sutton Manor, Old Mill, or Reed creeks, so the buildable envelope may be much smaller than the rear yard suggests. Top of bank on a wooded, incised channel has to be determined in the field from the ground surface. We scan the channel and adjacent ground, extract bare earth, and plot the setback line on the site plan.

Need ADU Surveys in Mill Valley?

Call (510) 543-2220 or request a quote — we'll scope your Mill Valley project and give you a fixed price.

Meeting-first estimates • Response within 24 hours • Serious projects only