ADU Surveys in Oakland, CA
We provide ADU surveys throughout Oakland, Alameda County — the wet-stamped line and topographic surveys the city's ADU checklist explicitly requires, plus the site plan base map every application starts with.
ADU Surveys in Oakland: Local Conditions
Oakland writes the strongest ADU survey triggers in the East Bay directly into its application checklist. A line and/or topographic survey — prepared by a California licensed land surveyor, wet-stamped, and no more than three years old — is required whenever a new or replacement footprint comes within 3 feet of a property line, or whenever the lot slopes 20 percent or more. At the building-permit step, the checklist adds that a boundary survey is required if the structure appears within 10 feet of a property line — which describes nearly every backyard ADU designed to the state's 4-foot setbacks. In the flatlands of West Oakland, Fruitvale, and East Oakland, that boundary trigger is usually the operative one; in Montclair, Rockridge, and the upper hills, the 20-percent slope trigger takes over and brings existing and proposed contours, cross-sections, and a grading plan with it.
The checklist's site-plan requirements go beyond property lines: retaining walls need top and bottom elevations, trees need trunk diameters — including neighbors' trees within 10 feet of construction — and creekside parcels need a Creek Protection Permit under the municipal code. Our laser-scanned survey approach captures all of it in one site visit: boundary evidence, structures, walls with elevations, tree trunks with measurable diameters, and a dense ground surface that produces defensible contours for hillside plan check. Fire-rebuild lots in the hills carry engineered slopes and Alquist-Priolo fault-zone scrutiny on top of the standard requirements, and we design the survey scope around what your specific parcel will face.
Deliverables are a stamped site plan base map and layered DWG your designer draws the ADU on directly, with property corners staked so the 4-foot setback is real on the ground. Where terrain drives the project, see our Oakland topographic surveys; for the combined boundary-plus-terrain scope most hillside ADUs need, our site plan surveys cover both in one mobilization.
Full service details, process, and deliverables: ADU Surveys & Site Plans for Permit Applications · All surveying in Oakland: Oakland land surveying
What's Included
- Scaled site plan base map matching city ADU checklists
- Boundary verification — 4-ft setbacks measured from the true line, not the fence
- Property corners staked for design and construction
- 1-foot contours and drainage data for sloped lots
- Easement and utility locations from record research
- CAD-ready DWG base file your designer builds on directly
- Foundation form verification when the inspector requires it
Our Process
Checklist Review
We confirm your city's ADU submittal requirements — site plan content, survey triggers, slope and drainage items — so the survey is scoped to what plan check will actually ask for.
Boundary & Records Research
We research your deed, recorded maps, and easements, then locate existing monuments to establish where your property lines actually are.
Site Survey
One laser-scanned site visit captures structures, hardscape, trees, utilities, and terrain — spot elevations and contours included where the lot slopes or the city requires them.
Deliverables
You receive a stamped site plan base map and layered DWG file sized to your city's checklist, with property corners staked on the ground for your designer and builder.
ADU Surveys in Oakland: FAQ
Need ADU Surveys in Oakland?
Call (510) 543-2220 or request a quote — we'll scope your Oakland project and give you a fixed price.
Meeting-first estimates • Response within 24 hours • Serious projects only