ADU Surveys in Berkeley, CA

We provide ADU surveys across Berkeley, Alameda County, where the city's building-permit checklist requires a survey for all new construction — every new detached ADU included.

ADU Surveys in Berkeley: Local Conditions

Berkeley leaves less room for the survey question than any city in the East Bay: the building-permit submittal checklist for one- and two-family dwellings lists a survey requirement for all new construction — which means every new detached ADU — plus additions within 1 foot of a property line, additions within 6 feet without fire-resistive construction, and even new windows or wall openings within 4 feet of a line. On Berkeley's narrow flatland lots, where brown-shingle houses already crowd their setbacks, those distance triggers catch most attached-ADU and conversion projects too. The site plan itself must show the entire parcel with lot dimensions, easements and creeks, retaining walls, and underground utilities with connection points.

In the Hillside Overlay district the requirements escalate: zoning applications need a boundary and/or topography survey wet-stamped by a licensed surveyor, no more than five years old, with contour lines — and hillside ADUs are capped smaller than the citywide standard (850 square feet for a studio or one-bedroom, 1,000 for two or more bedrooms, against 1,200 citywide). Grading beyond 50 cubic yards adds a grading plan with existing and final elevations. Berkeley's Creeks Ordinance and Coast Live Oak Ordinance overlay all of it, and parcels near the Hayward fault trace draw extra site-documentation scrutiny. Our laser-scanned surveys handle the full stack in one visit: boundary, contours, walls, trees, and the neighboring structures that Berkeley's fire-separation and daylight-plane rules make relevant.

We deliver a stamped base map and layered DWG your designer builds on, with corners staked for construction. For terrain-driven hillside work, see our Berkeley topographic surveys; homeowners weighing an ADU condominium under Berkeley's ordinance will eventually need map and plan work a surveyor prepares as well.

Full service details, process, and deliverables: ADU Surveys & Site Plans for Permit Applications · All surveying in Berkeley: Berkeley land surveying

What's Included

  • Scaled site plan base map matching city ADU checklists
  • Boundary verification — 4-ft setbacks measured from the true line, not the fence
  • Property corners staked for design and construction
  • 1-foot contours and drainage data for sloped lots
  • Easement and utility locations from record research
  • CAD-ready DWG base file your designer builds on directly
  • Foundation form verification when the inspector requires it

Our Process

1

Checklist Review

We confirm your city's ADU submittal requirements — site plan content, survey triggers, slope and drainage items — so the survey is scoped to what plan check will actually ask for.

2

Boundary & Records Research

We research your deed, recorded maps, and easements, then locate existing monuments to establish where your property lines actually are.

3

Site Survey

One laser-scanned site visit captures structures, hardscape, trees, utilities, and terrain — spot elevations and contours included where the lot slopes or the city requires them.

4

Deliverables

You receive a stamped site plan base map and layered DWG file sized to your city's checklist, with property corners staked on the ground for your designer and builder.

ADU Surveys in Berkeley: FAQ

The city's building-permit submittal checklist lists "all new construction" as a survey trigger, so a new detached ADU falls squarely inside it. Additions within 1 foot of a property line, additions within 6 feet without fire-resistive construction, and new windows within 4 feet of a line trigger it too. It is one of the most survey-forward checklists in the Bay Area.
Zoning-level applications in the "-H" district require a wet-stamped boundary/topography survey no more than five years old with contour lines, and hillside ADU sizes are capped at 850–1,000 square feet depending on bedrooms. Average slope, height from existing grade, and daylight-plane numbers all come off the survey, so the contour data has to be defensible — which is exactly what our laser-scanned topo produces.
Likely yes. Berkeley's checklist requires easements and creeks on the site plan, and the Creeks Ordinance regulates construction near culverted and open creeks citywide. We map the creek features and applicable setbacks as part of the site survey so your designer knows the buildable envelope before drawing anything.

Need ADU Surveys in Berkeley?

Call (510) 543-2220 or request a quote — we'll scope your Berkeley project and give you a fixed price.

Meeting-first estimates • Response within 24 hours • Serious projects only