ADU Surveys in Brentwood, CA

We provide ADU surveys in Brentwood, Contra Costa County — boundary and site documentation for a city whose ADU rules include a utility-routing requirement most homeowners discover late.

ADU Surveys in Brentwood: Local Conditions

Brentwood's published ADU handout is brief, but one requirement stands out and it is utility-shaped: detached ADU utilities may not simply extend from the primary house — the unit must connect to the property's private lateral or take a separate main connection, which puts Public Works and real utility routing into a project most cities treat as an afterthought. Locating the existing lateral, the cleanouts, and the feasible trench path is site documentation work, and it belongs on the plan before design locks in a corner of the yard the sewer cannot reach economically. The city also requires a deed restriction recorded with the county before permit issuance, keeps ADU design matched to the primary dwelling, and issues no separate ADU addresses.

Brentwood's parcels carry a distinctive boundary story. The city is agricultural land in transition — orchard and row-crop parcels giving way to master-planned subdivisions — which produces two very different survey situations. In the newer subdivisions, lot corners are recent and recoverable, and a boundary verification is quick. On the older ag-edge parcels described by metes and bounds, the deed calls can be vague, the original surveys unrecorded, and the fences approximate — the same conditions that make East County boundary retracement genuinely difficult, pointed at a backyard ADU. Either way the state's 4-foot setbacks are measured from the resolved line, and field inspectors frequently require a surveyor to verify foundation forms against the approved plans before the pour. Our laser-scanned site survey establishes the boundary, maps structures, utilities, and the lateral routing question, and delivers a stamped base map your designer and Public Works can both work from.

Records run through the Contra Costa County Recorder in Martinez. Deliverables include staked corners and a layered DWG; for parcels headed toward a split as well as an ADU, our Brentwood parcel map services share the same boundary work.

Full service details, process, and deliverables: ADU Surveys & Site Plans for Permit Applications · All surveying in Brentwood: Brentwood land surveying

What's Included

  • Scaled site plan base map matching city ADU checklists
  • Boundary verification — 4-ft setbacks measured from the true line, not the fence
  • Property corners staked for design and construction
  • 1-foot contours and drainage data for sloped lots
  • Easement and utility locations from record research
  • CAD-ready DWG base file your designer builds on directly
  • Foundation form verification when the inspector requires it

Our Process

1

Checklist Review

We confirm your city's ADU submittal requirements — site plan content, survey triggers, slope and drainage items — so the survey is scoped to what plan check will actually ask for.

2

Boundary & Records Research

We research your deed, recorded maps, and easements, then locate existing monuments to establish where your property lines actually are.

3

Site Survey

One laser-scanned site visit captures structures, hardscape, trees, utilities, and terrain — spot elevations and contours included where the lot slopes or the city requires them.

4

Deliverables

You receive a stamped site plan base map and layered DWG file sized to your city's checklist, with property corners staked on the ground for your designer and builder.

ADU Surveys in Brentwood: FAQ

Detached ADU utilities cannot extend from the house — the unit must tap the property's private lateral or take a separate main connection. That makes locating the existing lateral and planning a feasible routing part of siting the ADU, not a construction afterthought. We locate the visible utility evidence and map the routing constraints with the site survey.
It complicates the boundary. Ag-era parcels described by metes and bounds often have vague deed calls, unrecorded original surveys, and approximate fencing, so the 4-foot setback has no reliable reference until the line is resolved from record research and monument evidence. That is standard work for us in East County, and it is much cheaper before design than after forms are set.
A deed restriction must be recorded with the county before issuance, the design must match the primary dwelling, and the utility connection must comply with the separate-lateral rule. None of these are survey items, but all of them sit downstream of a site plan that reflects the parcel accurately — which is where we come in.

Need ADU Surveys in Brentwood?

Call (510) 543-2220 or request a quote — we'll scope your Brentwood project and give you a fixed price.

Meeting-first estimates • Response within 24 hours • Serious projects only