ADU Surveys in Martinez, CA

We provide ADU surveys in Martinez, Contra Costa County — metes-and-bounds plot plans with title-report research, and the 2-foot-contour topography the city requires once a lot has more than 5 feet of elevation difference.

ADU Surveys in Martinez: Local Conditions

Martinez asks for a plot plan with surveyor DNA: lot dimensions stated as metes and bounds, dimensioned setbacks for all existing, proposed, and adjacent structures abutting the property, every projection and eave dimensioned to the property lines, a copy of the property's title report, easements and restrictions, and trees with species, trunk size, and the extent of their canopy. Then comes the elevation trigger — on lots with more than 5 feet of elevation difference, the checklist requires topography with existing and proposed contours at 2-foot intervals, plus pad and garage floor elevations and a ground-slope drainage scheme on hillside sites, with retaining walls labeled top-of-wall and bottom-of-wall. Five feet of relief is a low bar in Martinez: outside the flat downtown grid, the neighborhoods climbing toward Alhambra Hills, Vine Hill, and the Franklin Canyon edges cross it in a single backyard.

A soils report prepared by a California-licensed civil engineer sits on the checklist as an as-applicable item, and the city's ADU page tells applicants to consider FEMA flood zones and fire-severity zones early — Alhambra Creek's corridor through downtown carries real flood history. Martinez also requires sanitary district approval before the building-permit application is even submitted, so sequencing matters. Our laser-scanned site survey covers the checklist in one visit: boundary resolved from record research (the metes-and-bounds requirement makes deed work unavoidable), title-report easements mapped onto the plan, tree canopies captured as measured driplines, and dense elevations that produce the 2-foot contours and pad-elevation data the moment your lot crosses the 5-foot threshold.

As the county seat, Martinez keeps the recording loop short — the Contra Costa County Recorder and County Surveyor are both in town. Deliverables are a stamped base map, layered DWG, and staked corners; for terrain-led projects see our Martinez topographic surveys.

Full service details, process, and deliverables: ADU Surveys & Site Plans for Permit Applications · All surveying in Martinez: Martinez land surveying

What's Included

  • Scaled site plan base map matching city ADU checklists
  • Boundary verification — 4-ft setbacks measured from the true line, not the fence
  • Property corners staked for design and construction
  • 1-foot contours and drainage data for sloped lots
  • Easement and utility locations from record research
  • CAD-ready DWG base file your designer builds on directly
  • Foundation form verification when the inspector requires it

Our Process

1

Checklist Review

We confirm your city's ADU submittal requirements — site plan content, survey triggers, slope and drainage items — so the survey is scoped to what plan check will actually ask for.

2

Boundary & Records Research

We research your deed, recorded maps, and easements, then locate existing monuments to establish where your property lines actually are.

3

Site Survey

One laser-scanned site visit captures structures, hardscape, trees, utilities, and terrain — spot elevations and contours included where the lot slopes or the city requires them.

4

Deliverables

You receive a stamped site plan base map and layered DWG file sized to your city's checklist, with property corners staked on the ground for your designer and builder.

ADU Surveys in Martinez: FAQ

The building checklist requires topography once the lot has more than a 5-foot elevation difference — existing and proposed contours at 2-foot intervals, pad and garage floor elevations, and a drainage scheme on hillside sites. Most Martinez lots outside the downtown flat cross that threshold, so plan on contours unless your parcel is genuinely level.
Metes-and-bounds lot dimensions come from the deed record, and the title report surfaces the easements and restrictions the plan must show. That is boundary-research territory — we pull the record, resolve the lines against monument evidence on the ground, and put both the dimensions and the easements of record on the plot plan.
Sanitary district approval is required before the building-permit application, and flood or fire-zone constraints are worth confirming up front — the city directs applicants to check FEMA zones early, and Alhambra Creek parcels carry real flood mapping. A survey first, then design, then agency sign-offs keeps the 60-day ministerial clock from restarting on corrections.

Need ADU Surveys in Martinez?

Call (510) 543-2220 or request a quote — we'll scope your Martinez project and give you a fixed price.

Meeting-first estimates • Response within 24 hours • Serious projects only