ADU Surveys in San Leandro, CA

We provide ADU surveys in San Leandro, Alameda County — site plan base maps plus the elevation certificates the city requires for parcels in the 100-year floodplain.

ADU Surveys in San Leandro: Local Conditions

San Leandro's ADU submittal guidelines put two survey-adjacent requirements in writing. First, every plan set's cover sheet must state the parcel's zone designations — zoning, liquefaction, flood, sanitary, and school district — which means knowing early whether your lot sits in a mapped hazard zone. Second, and more concretely: parcels in the 100-year floodplain must conform to the municipal code's floodplain mitigation requirements, demonstrated with an elevation certificate — a FEMA document that only comes from surveyed elevations. San Leandro's creek corridors and low-lying western neighborhoods put a meaningful share of the city's ADU-friendly backyards inside that floodplain, and new detached structures in liquefaction or landslide zones add a soils report to the list.

The rest of the picture is standard but real: site, existing, demolition, and proposed plans drawn to scale, lot coverage and floor-area numbers that depend on accurate lot dimensions, and the state's 4-foot setbacks measured from legal lines that San Leandro's postwar fences track only approximately. The city's housing stock — compact ranch and bungalow lots platted in the 1940s and 50s — leaves most detached ADUs designed tight to the rear corner, exactly where accumulated fence drift matters most. Our laser-scanned site survey establishes the boundary, captures structures, hardscape, and drainage-relevant elevations in one visit, and produces the base map your designer needs plus the elevation certificate if your parcel is flood-mapped.

San Leandro runs a pre-reviewed ADU plan program that shortens design timelines — but pre-reviewed plans still need site-specific siting, and that is survey work. Deliverables are a stamped base map, staked corners, layered DWG, and FEMA elevation certificates where required, with records through the Alameda County Recorder. For terrain-driven parcels along the eastern hills, see our San Leandro topographic surveys.

Full service details, process, and deliverables: ADU Surveys & Site Plans for Permit Applications · All surveying in San Leandro: San Leandro land surveying

What's Included

  • Scaled site plan base map matching city ADU checklists
  • Boundary verification — 4-ft setbacks measured from the true line, not the fence
  • Property corners staked for design and construction
  • 1-foot contours and drainage data for sloped lots
  • Easement and utility locations from record research
  • CAD-ready DWG base file your designer builds on directly
  • Foundation form verification when the inspector requires it

Our Process

1

Checklist Review

We confirm your city's ADU submittal requirements — site plan content, survey triggers, slope and drainage items — so the survey is scoped to what plan check will actually ask for.

2

Boundary & Records Research

We research your deed, recorded maps, and easements, then locate existing monuments to establish where your property lines actually are.

3

Site Survey

One laser-scanned site visit captures structures, hardscape, trees, utilities, and terrain — spot elevations and contours included where the lot slopes or the city requires them.

4

Deliverables

You receive a stamped site plan base map and layered DWG file sized to your city's checklist, with property corners staked on the ground for your designer and builder.

ADU Surveys in San Leandro: FAQ

If your parcel is in the 100-year floodplain, yes — the city's ADU submittal guidelines require conformance with the municipal floodplain mitigation rules, verified with an elevation certificate. We check your parcel's FEMA mapping up front and, where the certificate is needed, produce it from the same site visit as the boundary and site plan work.
San Leandro requires a soils report for new detached structures in mapped liquefaction or landslide zones, and the cover sheet of your plan set must state those zone designations. We identify the applicable zones during project setup so the geotechnical scope — and its cost — is known before design begins rather than discovered at intake.
The pre-reviewed program shortens plan review, but the building still has to land legally on your specific lot — setbacks from true property lines, lot coverage, utilities, and flood elevations are all site-specific. A site survey is what turns a pre-reviewed floor plan into an approvable application for your parcel.

Need ADU Surveys in San Leandro?

Call (510) 543-2220 or request a quote — we'll scope your San Leandro project and give you a fixed price.

Meeting-first estimates • Response within 24 hours • Serious projects only