ADU Surveys in Pinole, CA

We provide ADU surveys in Pinole, Contra Costa County — site plans carrying the utility, tree, and distance measurements the city's checklist itemizes, on old-town and hillside lots alike.

ADU Surveys in Pinole: Local Conditions

Pinole's ADU checklist is more granular than its neighbors': the site plan must show easements, all structures, trees over just 4 inches in diameter — the lowest tree threshold in the county — utility line locations, right-of-way features, and two measured distances most applicants have never thought about: from the ADU to the nearest fire hydrant (under 400 feet brings additional requirements) and from the ADU to the curb (under 150 feet likewise). The city also requires a sewer lateral certificate of compliance issued within the last ten years, backed by a dated lateral video from cleanout to main — so the sewer, like everything else on this checklist, is verified rather than assumed. These are measurement tasks, and they all live naturally on a surveyed base map.

Pinole's terrain splits along Pinole Creek. Old Town's compact grid near San Pablo Avenue dates to the early 1900s, with the familiar drift between record lines and hundred-year-old fences; the postwar and newer tracts climb the valley walls, where backyard slopes put grading and drainage into play even though the ADU checklist never mentions topography. Pinole Valley's creek corridor adds its own setbacks and flood considerations for adjacent parcels. Our laser-scanned site survey handles the full checklist in one visit — boundary, structures, the 4-inch-and-up trees, utility evidence, hydrant and curb distances measured rather than paced — and field inspectors frequently require a surveyor to verify foundation forms against the approved setbacks before the pour, which the same boundary work supports with a short return visit.

Records run through the Contra Costa County Recorder in Martinez. Deliverables are a stamped base map, layered DWG, and staked corners; for slope-led projects on the valley walls see our Pinole topographic surveys.

Full service details, process, and deliverables: ADU Surveys & Site Plans for Permit Applications · All surveying in Pinole: Pinole land surveying

What's Included

  • Scaled site plan base map matching city ADU checklists
  • Boundary verification — 4-ft setbacks measured from the true line, not the fence
  • Property corners staked for design and construction
  • 1-foot contours and drainage data for sloped lots
  • Easement and utility locations from record research
  • CAD-ready DWG base file your designer builds on directly
  • Foundation form verification when the inspector requires it

Our Process

1

Checklist Review

We confirm your city's ADU submittal requirements — site plan content, survey triggers, slope and drainage items — so the survey is scoped to what plan check will actually ask for.

2

Boundary & Records Research

We research your deed, recorded maps, and easements, then locate existing monuments to establish where your property lines actually are.

3

Site Survey

One laser-scanned site visit captures structures, hardscape, trees, utilities, and terrain — spot elevations and contours included where the lot slopes or the city requires them.

4

Deliverables

You receive a stamped site plan base map and layered DWG file sized to your city's checklist, with property corners staked on the ground for your designer and builder.

ADU Surveys in Pinole: FAQ

Detail. Trees down to 4 inches in diameter, utility line locations, right-of-way features, and measured distances to the nearest hydrant (400-foot threshold) and to the curb (150-foot threshold) all belong on the site plan, and a sewer lateral compliance certificate within the last ten years is required with video documentation. Our survey captures the mapped items in one visit so the checklist is answered rather than approximated.
The checklist requires the plan to state the distance from the ADU to the nearest fire hydrant, and distances under 400 feet may bring additional requirements — likewise under 150 feet to the curb. These are fire-access measurements the city wants as numbers, not estimates, and we measure them as part of the site survey.
Treat them as unverified. The early-1900s grid predates modern standards, and fences and garages on the compact lots routinely sit off the record lines. We resolve the boundary from county records and monument evidence before your 4-foot setback gets designed from the wrong reference.

Need ADU Surveys in Pinole?

Call (510) 543-2220 or request a quote — we'll scope your Pinole project and give you a fixed price.

Meeting-first estimates • Response within 24 hours • Serious projects only