Monument Preservation in Sausalito, CA
We perpetuate survey monuments for construction in Sausalito, Marin County — referencing monuments before they are disturbed, resetting them afterward, and filing Corner Records with the Marin County Surveyor under Business and Professions Code section 8771.
Monument Preservation in Sausalito: Local Conditions
Sausalito's own subdivision ordinance shows how deliberately these monuments were set. SMC Title 9 defines a monument as new galvanized iron pipe not less than two inches in diameter and 24 inches long, or a reinforced concrete post, each carrying a copper plate or disk securely attached by a copper dowel or nail marking the exact point and stamped with the registered license number of the engineer or surveyor. Street monuments are set so their tops are at least seven and one-half inches below finished pavement grade, enclosed in cast iron receptacles with covers set flush and supported independently of the monument, and all monuments and their locations are inspected and approved by the City Engineer. Where no monument is set at a lot corner, angle point, or curve point, a redwood hub is driven flush with the ground and the exact corner marked by a nonferrous metal tack.
All of that is destroyed easily. Section 8771 of the Business and Professions Code requires that monuments controlling property lines be located and referenced before construction disturbs them, and that a Corner Record or Record of Survey be filed. In Sausalito the hazards are paving and slurry work on Bridgeway and the hillside streets, reconstruction of public stairways and retaining walls, utility trenching in narrow rights-of-way, and driveway and encroachment work. Because so many boundaries here are retraced from a handful of surviving points, losing one degrades a whole neighborhood's boundary evidence, not just one corner.
We locate the monuments in the work area, tie them to durable references outside the limits of disturbance, file the pre-construction Corner Record with the Marin County Surveyor, and return afterward to reset and file. Where the corridor is complex, we scan it before demolition so surrounding evidence survives as measured geometry. See Sausalito parcel maps and monument preservation and section 8771.
Full service details, process, and deliverables: Monument Preservation for Construction · All surveying in Sausalito: Sausalito land surveying
What's Included
- Business & Professions Code §8771 compliance
- Corner Records filed before and after construction
- Reference ties set outside the disturbance zone
- Protects contractors and agencies from retracement liability
- Fast mobilization to keep construction schedules moving
- Serving contractors, cities, and utility districts
Our Process
Monument Search
We research record maps and locate every monument within the construction disturbance zone — street centerline monuments, property corners, and benchmarks.
Reference Ties & Corner Records
Each monument is tied to durable reference points outside the work area, and pre-construction Corner Records are filed with the county surveyor.
Construction Proceeds
Your project grades, paves, or trenches without monument liability. We remain available if unexpected monuments are uncovered during the work.
Reset & Final Filing
After construction we reset the monuments from the reference ties and file post-construction Corner Records, completing the statutory record.
Monument Preservation in Sausalito: FAQ
Monument Preservation Across the East Bay
Need Monument Preservation in Sausalito?
Call (510) 543-2220 or request a quote — we'll scope your Sausalito project and give you a fixed price.
Meeting-first estimates • Response within 24 hours • Serious projects only