Monument Preservation in Martinez, CA

Martinez is the seat of Contra Costa County, and its downtown grid along the Carquinez shoreline is among the oldest platted ground in the county. Before any street, utility, or grading project disturbs the monuments that control those historic blocks, Business and Professions Code §8771 requires that a licensed surveyor preserve them.

Monument Preservation in Martinez: Local Conditions

Monument preservation matters more in Martinez than almost anywhere else in Contra Costa County, because the monuments here are older and the stakes are higher. The downtown blocks were platted in the 1800s, and the original monuments set along those streets are often the only physical evidence of where the plat lines actually run. Once a paving crew grinds out an old pipe or a trenching contractor pulls a stone from an intersection, that evidence is gone — and every retracement in the neighborhood becomes an exercise in reconciling deeds, occupation, and junior-senior rights instead of simply finding the corner. Business and Professions Code §8771 exists precisely for this situation: before construction that may disturb a monument, the monument must be referenced by a licensed land surveyor and a Corner Record or Record of Survey filed, and after construction the monument must be reset and documented again.

Working in the county seat has a practical advantage: the Contra Costa County Surveyor and the County Recorder are both located in Martinez, so the maps, Corner Records, and field notes we rely on — and the filings we make on your behalf — are handled in the same town as the project. For city street rehabilitation, waterfront utility work near the refinery corridor, or grading in the Alhambra Valley and hillside neighborhoods, we search the record first, locate every monument in the work zone, and set durable reference points well outside the limits of disturbance.

Our Trimble terrestrial laser scanner adds a layer of protection older methods cannot: before the contractor mobilizes, we capture the intersection or corridor as a survey-grade point cloud, preserving each monument’s position within millions of measured points of curb, pavement, and surrounding improvements. If a monument is destroyed despite precautions, that record supports a defensible reset. The cost of a preservation survey is a small fraction of the retracement surveys — and potential boundary disputes — that follow a destroyed original monument. Learn more about our laser scanning services.

Full service details, process, and deliverables: Monument Preservation for Construction · All surveying in Martinez: Martinez land surveying

What's Included

  • Business & Professions Code §8771 compliance
  • Corner Records filed before and after construction
  • Reference ties set outside the disturbance zone
  • Protects contractors and agencies from retracement liability
  • Fast mobilization to keep construction schedules moving
  • Serving contractors, cities, and utility districts

Our Process

1

Monument Search

We research record maps and locate every monument within the construction disturbance zone — street centerline monuments, property corners, and benchmarks.

2

Reference Ties & Corner Records

Each monument is tied to durable reference points outside the work area, and pre-construction Corner Records are filed with the county surveyor.

3

Construction Proceeds

Your project grades, paves, or trenches without monument liability. We remain available if unexpected monuments are uncovered during the work.

4

Reset & Final Filing

After construction we reset the monuments from the reference ties and file post-construction Corner Records, completing the statutory record.

Monument Preservation in Martinez: FAQ

Under B&P Code §8771, the agency or owner causing the construction is responsible for ensuring monuments are perpetuated, and the work itself must be done by or under a licensed land surveyor. We handle the full cycle for contractors and agencies: pre-construction search and referencing, Corner Record filings with the Contra Costa County Surveyor here in Martinez, and post-construction resets.
The downtown grid was platted in the 1800s, and original monuments are the highest-ranking physical evidence of where those plat lines run. A destroyed original monument cannot truly be replaced — only re-established from references — so preserving it before paving or trenching protects every parcel that depends on it.
Before design is finalized, and always before grading, paving, or trenching begins. Early involvement lets us reference monuments and file Corner Records without delaying the contractor’s schedule, and it keeps the project compliant with §8771 from the first day of construction.

Need Monument Preservation in Martinez?

Call (510) 543-2220 or request a quote — we'll scope your Martinez project and give you a fixed price.

Meeting-first estimates • Response within 24 hours • Serious projects only