Monument Preservation in Vallejo, CA

Between the Victorian street grids of downtown and St. Vincent’s Hill and the infrastructure rebuilds underway on Mare Island — the West Coast’s first naval shipyard — Vallejo, in Solano County, has more construction bearing down on historic survey monuments than almost any city on the Carquinez Strait.

Monument Preservation in Vallejo: Local Conditions

Vallejo’s boundary framework rests on nineteenth-century street grids: the downtown blocks and the St. Vincent’s Hill Victorian district were laid out generations ago, and the monuments perpetuating those grids control thousands of narrow city lots. Street rehabilitation, sewer and water main replacement, and sidewalk reconstruction in these districts run directly over that evidence. Business and Professions Code §8771 requires that before any construction disturbs a monument, a licensed land surveyor reference it and file a Corner Record or Record of Survey, then reset and re-document the monument after the work is done. Vallejo sits in Solano County, so those filings go to the Solano County Surveyor and Recorder in Fairfield — a detail that surprises some contractors used to working across the strait in Contra Costa — and we handle the Fairfield filings on every engagement.

Mare Island is the larger challenge. The West Coast’s first naval shipyard is now a major adaptive-reuse district, and rebuilding its aged infrastructure — utilities serving the dry docks, machine shops, and officers’ quarters, plus new roadways and site work — means years of excavation across ground where the original engineering drawings are famously lost or incomplete. That makes surviving physical survey evidence on the island doubly precious: monuments and control points are often the most reliable spatial framework left. Preserving them under §8771 before trenching is not bureaucratic box-checking; it protects the geometric backbone that every future parcel conveyance and as-built survey on Mare Island will depend on. Waterfront work also crosses filled ground with mapped liquefaction zones under the Seismic Hazards Mapping Act, where geotechnical trenching widens the true zone of disturbance beyond the plan limits.

Our Trimble terrestrial laser scanner is built for exactly this environment: one visit captures monuments, pavements, rails, and structures as millions of survey-grade points, creating a durable pre-construction record on ground where paper records failed long ago. Referencing and resetting a monument costs a fraction of retracing a destroyed one across a former shipyard — that is the liability equation every project owner should run before excavation starts.

Full service details, process, and deliverables: Monument Preservation for Construction · All surveying in Vallejo: Vallejo land surveying

What's Included

  • Business & Professions Code §8771 compliance
  • Corner Records filed before and after construction
  • Reference ties set outside the disturbance zone
  • Protects contractors and agencies from retracement liability
  • Fast mobilization to keep construction schedules moving
  • Serving contractors, cities, and utility districts

Our Process

1

Monument Search

We research record maps and locate every monument within the construction disturbance zone — street centerline monuments, property corners, and benchmarks.

2

Reference Ties & Corner Records

Each monument is tied to durable reference points outside the work area, and pre-construction Corner Records are filed with the county surveyor.

3

Construction Proceeds

Your project grades, paves, or trenches without monument liability. We remain available if unexpected monuments are uncovered during the work.

4

Reset & Final Filing

After construction we reset the monuments from the reference ties and file post-construction Corner Records, completing the statutory record.

Monument Preservation in Vallejo: FAQ

Because the original shipyard drawings are lost or incomplete, the surviving monuments and survey control are often the best remaining spatial framework for the island. Once a monument is destroyed there, re-establishing it is unusually difficult and expensive, so §8771 referencing before infrastructure rebuilds is essential.
Before trenching, we search the record, recover the monuments along the alignment, set reference points outside the work zone, and file pre-construction Corner Records with the Solano County Surveyor in Fairfield. After paving, we reset disturbed monuments and file the post-construction records — a clean, documented §8771 cycle.
Yes. Vallejo is in Solano County, so Corner Records go to the Solano County Surveyor and recorded documents to the Solano County Recorder, both in Fairfield. We route every filing to the correct county as part of the service.

Need Monument Preservation in Vallejo?

Call (510) 543-2220 or request a quote — we'll scope your Vallejo project and give you a fixed price.

Meeting-first estimates • Response within 24 hours • Serious projects only