Monument Preservation in Concord, CA
Concord is Contra Costa County’s largest city, and its scale means large annual paving programs, utility replacements, and one of the Bay Area’s biggest redevelopment sites at the former Naval Weapons Station — all work that routinely threatens survey monuments protected under B&P Code §8771.
Monument Preservation in Concord: Local Conditions
In a city of Concord’s size, monument destruction is usually not a single dramatic event — it is the slow attrition of a large capital program. Every mile of pavement rehabilitation, every water main replacement, and every sewer trench through the broad postwar tracts crosses street centerlines and intersections where the monuments controlling entire subdivisions were set. Business and Professions Code §8771 requires that before construction disturbs those monuments, a licensed surveyor reference them and file a Corner Record or Record of Survey with the county surveyor, then reset and document them after construction. For contractors and public agencies, building that step into the project schedule is far cheaper than the alternative: when monuments vanish under new asphalt, every future survey in the tract must be retraced from scattered evidence, at a cost that dwarfs what preservation would have been.
Concord’s redevelopment pipeline raises the stakes. Infrastructure for the former Concord Naval Weapons Station — one of the largest redevelopment sites in the Bay Area — will involve years of grading, backbone utilities, and roadway construction across ground where existing monuments and federal-era survey control must be found, evaluated, and perpetuated before machines move. Downtown, BART-area transit-oriented projects and repositioning of aging commercial and industrial parcels generate the same need on a block-by-block scale. We file all Corner Records with the Contra Costa County Surveyor in Martinez and coordinate resets with the contractor’s punch list so compliance never holds up acceptance.
Our Trimble terrestrial laser scanner is particularly useful on Concord’s long corridor projects: one scan session captures every monument, curb line, and surface feature along the alignment as a survey-grade point cloud, giving us — and the city — a permanent, measurable record of pre-construction conditions. If a well or disk is lost mid-project, the reset is grounded in dense, verifiable data rather than a handful of tie distances.
Full service details, process, and deliverables: Monument Preservation for Construction · All surveying in Concord: Concord land surveying
What's Included
- Business & Professions Code §8771 compliance
- Corner Records filed before and after construction
- Reference ties set outside the disturbance zone
- Protects contractors and agencies from retracement liability
- Fast mobilization to keep construction schedules moving
- Serving contractors, cities, and utility districts
Our Process
Monument Search
We research record maps and locate every monument within the construction disturbance zone — street centerline monuments, property corners, and benchmarks.
Reference Ties & Corner Records
Each monument is tied to durable reference points outside the work area, and pre-construction Corner Records are filed with the county surveyor.
Construction Proceeds
Your project grades, paves, or trenches without monument liability. We remain available if unexpected monuments are uncovered during the work.
Reset & Final Filing
After construction we reset the monuments from the reference ties and file post-construction Corner Records, completing the statutory record.
Monument Preservation in Concord: FAQ
Need Monument Preservation in Concord?
Call (510) 543-2220 or request a quote — we'll scope your Concord project and give you a fixed price.
Meeting-first estimates • Response within 24 hours • Serious projects only