Monument Preservation in Novato, CA

We provide monument perpetuation for construction in Novato, Marin County — referencing survey monuments before they are disturbed, resetting them afterward, and filing Corner Records with the Marin County Surveyor as Business and Professions Code section 8771 requires.

Monument Preservation in Novato: Local Conditions

Section 8771 of the Business and Professions Code is unambiguous: monuments controlling property lines must be located and referenced before construction that would disturb or destroy them, and a Corner Record or Record of Survey has to be filed. It applies to far more than subdivision work. In Novato the routine offenders are paving and slurry projects on Grant Avenue, Redwood Boulevard, and the residential collectors, curb ramp and sidewalk reconstruction, trenching by the Novato Sanitary District and North Marin Water District, undergrounding, and the roadway, culvert, and levee work along the bay margin near Hamilton and Bel Marin Keys. A centerline monument that has sat under a cast iron cover for fifty years is gone in one pass of a grinder, and nobody notices until a surveyor comes looking for it two decades later.

The cost of getting this right is trivial compared to the cost of the alternative. Losing a controlling monument does not just erase one point; it degrades every boundary in the block that was ever tied to it, and the retracement expense lands on private owners who had nothing to do with the project. We locate the monuments in the work area, tie them to durable references outside the limits of disturbance, file the pre-construction Corner Record, and return after the work to reset the monument in position and file the record showing what was done. Where the site is complex, we scan the corridor before demolition so the surrounding evidence — curb returns, wall faces, structures — is preserved as measured geometry, not memory.

Corner Records are checked by the Marin County Surveyor in San Rafael and filed with the Marin County Recorder. Deliverables are the referenced monument ties, the filed records, and reset monuments. See our Novato parcel map work and the background piece on monument preservation and section 8771.

Full service details, process, and deliverables: Monument Preservation for Construction · All surveying in Novato: Novato land surveying

What's Included

  • Business & Professions Code §8771 compliance
  • Corner Records filed before and after construction
  • Reference ties set outside the disturbance zone
  • Protects contractors and agencies from retracement liability
  • Fast mobilization to keep construction schedules moving
  • Serving contractors, cities, and utility districts

Our Process

1

Monument Search

We research record maps and locate every monument within the construction disturbance zone — street centerline monuments, property corners, and benchmarks.

2

Reference Ties & Corner Records

Each monument is tied to durable reference points outside the work area, and pre-construction Corner Records are filed with the county surveyor.

3

Construction Proceeds

Your project grades, paves, or trenches without monument liability. We remain available if unexpected monuments are uncovered during the work.

4

Reset & Final Filing

After construction we reset the monuments from the reference ties and file post-construction Corner Records, completing the statutory record.

Monument Preservation in Novato: FAQ

If the work will disturb a monument that controls a property line, yes — the statute turns on disturbance, not on project size. A short utility trench down the middle of a residential street can destroy a centerline monument just as thoroughly as a full reconstruction. The practical test is whether a monument exists in the work area, which is a half-day question we can answer before you mobilize.
The party performing the work that disturbs the monument. On public projects it is normally carried as a line item in the contract and handled by the contractor's surveyor; on private work it falls to the owner or developer. Either way it is far cheaper as a planned pre-construction task than as an after-the-fact retracement once the monument is under new asphalt.
Sometimes, if enough surviving evidence exists to re-establish the position — other monuments from the same survey, ties in an earlier Record of Survey or Corner Record, or reliable record measurements. The reconstruction has to be documented and filed. It is slower and more expensive than referencing the monument beforehand, and in some cases the original position simply cannot be recovered with confidence.