ALTA/NSPS Surveys in Novato, CA

We prepare ALTA/NSPS Land Title Surveys for commercial property in Novato, Marin County — title easements plotted and dimensioned, improvements located, encroachments identified, and the Table A items your lender and title company require.

ALTA/NSPS Surveys in Novato: Local Conditions

Novato holds most of Marin County's larger commercial and industrial inventory, and the transactions follow the geography. Along the Redwood Boulevard and Highway 101 corridor there are retail centers, auto rows, and office buildings on parcels assembled over decades from older rural descriptions. At Hamilton and around Bel Marin Keys, business-park and light-industrial parcels sit on ground with a redevelopment history, an unusual density of utility and access easements, and neighbors that include levees, restored wetland, and public open space. North and west of town the commercial parcels shade into acreage where the record description may still call for fences, creeks, and ridgelines. A buyer or lender arriving from out of the area rarely expects the record complexity attached to a straightforward-looking site.

Our ALTA work starts with the title commitment. Every recorded exception gets plotted or explicitly reported as unplottable, and we chase the underlying documents through Marin County records rather than accepting a schedule at face value. Field work locates the improvements, parking counts, visible and marked utilities, and evidence of use by others — worn access, drainage that runs onto a neighbor, structures and paving that cross a line. Where the site is large or heavily improved, we scan it: the same visit that produces the survey base produces a point cloud that answers the questions asked during due diligence without a second mobilization. Table A selections, including the flood zone determination, zoning setback graphics, contours, and utility items, are set with your counsel before we mobilize.

You receive a signed and sealed ALTA/NSPS survey in PDF and DWG on the current standards, with the certification worded for your named parties. See our complete guide to ALTA surveys and, where terrain is part of the diligence, Novato topographic surveys.

Full service details, process, and deliverables: ALTA/NSPS Land Title Surveys · All surveying in Novato: Novato land surveying

What's Included

  • Built to the 2021 ALTA/NSPS Minimum Standard Detail Requirements
  • All Table A optional items available (1–20, plus negotiated 21)
  • Direct coordination with title officer for commitment exceptions
  • Closing-driven scheduling with realistic turnaround commitments
  • Underwriter-ready surveyor's certificate addressed to your stack
  • Concurrent topo and existing-conditions capture when needed

Our Process

1

Order Intake & Title Review

We review the title commitment, legal description, prior survey (if any), lender requirements, and which Table A items the deal demands.

2

Research & Plat-of-Survey Setup

Record research, deed and easement analysis, plotting of Schedule B exceptions, and identification of the parties the certificate must be addressed to.

3

Field Survey

Boundary recovery, improvement and encroachment location, evidence of utilities and easements, and any Table A item that requires field measurement.

4

Drafting & Title Coordination

We plot Schedule B exceptions, note the survey's relationship to each, and circulate a draft to title and counsel for review before signing.

5

Signed & Sealed Delivery

Final wet-stamped plat with surveyor's certificate addressed per the title commitment, delivered as PDF and DWG in time for closing.

ALTA/NSPS Surveys in Novato: FAQ

For a typical improved commercial parcel, roughly three to five weeks from receipt of a complete title commitment with legible exception documents. Larger assemblages, sites with unresolved boundary conflicts, or parcels needing record research back through rural conveyances take longer. Tell us the closing date early and we will tell you honestly whether it is achievable.
That is a conversation with your lender and counsel, not a default list. In Novato the flood zone item earns its keep on anything near Novato Creek or the bay margin, the zoning item matters where a use is nonconforming, and the utility item is worth having on business-park parcels where private lines cross lot lines. We will review the draft list and flag items that will not produce useful information on your particular site.
Records of Survey and Corner Records are checked by the Marin County Surveyor in the Department of Public Works in San Rafael and recorded by the Marin County Recorder. An ALTA survey itself is not a recorded document, but if our field work resolves a boundary in a way that materially differs from the record, state law may require a Record of Survey, and we will tell you before that becomes a schedule surprise.

Need ALTA/NSPS Surveys in Novato?

Call (510) 543-2220 or request a quote — we'll scope your Novato project and give you a fixed price.

Meeting-first estimates • Response within 24 hours • Serious projects only