ALTA/NSPS Surveys in Martinez, CA

We prepare ALTA/NSPS Land Title Surveys for commercial transactions in Martinez, the Contra Costa County seat, from downtown storefront buildings to refinery-adjacent industrial land.

ALTA/NSPS Surveys in Martinez: Local Conditions

Martinez is where every ALTA/NSPS Land Title Survey in Contra Costa County ultimately points: the Contra Costa County Recorder and County Surveyor offices are located here, which means the deeds, recorded maps, and easement documents behind a title commitment are researched a short walk from many of the properties we survey. The city's commercial real estate splits into two distinct due-diligence problems. Downtown, buildings sit on some of the county's oldest plats — an 1800s grid laid out along the Carquinez shoreline — where zero-lot-line construction makes encroachments common and the 2021 Minimum Standard Detail Requirements' emphasis on evidence of possession really matters. East of downtown, refinery-adjacent industrial parcels carry a dense easement history: pipeline corridors, rail spur rights, and utility grants that surface as Schedule B exceptions and must be plotted, not just listed.

Our work follows the ALTA/NSPS 2021 standards adopted jointly by the American Land Title Association and the National Society of Professional Surveyors: we resolve the boundary against the record and found monuments, plot each Schedule B exception the title company identifies, locate improvements and utilities evidence, and flag encroachments in both directions. Where an old pipeline or spur easement has a vague or unlocatable description — common on Martinez industrial land — we say so on the face of the survey, which is exactly the disclosure lenders and title insurers need before closing.

Our Trimble terrestrial laser scanner lets us capture an entire Martinez site — building footprints, parking striping, curb lines, overhead utilities — in one mobilization. Negotiated Table A items such as 6(b) building dimensions, item 7 exterior building measurements, and item 9 parking counts are measured from the point cloud rather than through repeat site visits, and the cloud remains available after closing for as-built and renovation documentation.

Full service details, process, and deliverables: ALTA/NSPS Land Title Surveys · All surveying in Martinez: Martinez land surveying

What's Included

  • Built to the 2021 ALTA/NSPS Minimum Standard Detail Requirements
  • All Table A optional items available (1–20, plus negotiated 21)
  • Direct coordination with title officer for commitment exceptions
  • Closing-driven scheduling with realistic turnaround commitments
  • Underwriter-ready surveyor's certificate addressed to your stack
  • Concurrent topo and existing-conditions capture when needed

Our Process

1

Order Intake & Title Review

We review the title commitment, legal description, prior survey (if any), lender requirements, and which Table A items the deal demands.

2

Research & Plat-of-Survey Setup

Record research, deed and easement analysis, plotting of Schedule B exceptions, and identification of the parties the certificate must be addressed to.

3

Field Survey

Boundary recovery, improvement and encroachment location, evidence of utilities and easements, and any Table A item that requires field measurement.

4

Drafting & Title Coordination

We plot Schedule B exceptions, note the survey's relationship to each, and circulate a draft to title and counsel for review before signing.

5

Signed & Sealed Delivery

Final wet-stamped plat with surveyor's certificate addressed per the title commitment, delivered as PDF and DWG in time for closing.

ALTA/NSPS Surveys in Martinez: FAQ

Downtown Martinez sits on an 1800s plat where buildings frequently share walls or sit at zero lot line, so the gap between record boundaries and actual occupation can be significant. An ALTA/NSPS survey documents encroachments, access, and plotted easements to the national 2021 standard, which is what allows the title insurer to delete or endorse over survey exceptions.
Yes — plotting Schedule B exceptions is a core ALTA/NSPS requirement, and refinery-adjacent Martinez parcels often carry decades of pipeline and spur grants. We research the underlying documents at the Contra Costa Recorder here in Martinez, plot each locatable easement on the survey, and note on the face of the map any easement whose description is too vague to place.
For downtown commercial deals we most often see items 6 (zoning), 7 (building dimensions), 8 (substantial features), 9 (parking), and 11 (utilities evidence). Because we scan the full site with terrestrial LiDAR, adding measured Table A items rarely requires a second mobilization.

Need ALTA/NSPS Surveys in Martinez?

Call (510) 543-2220 or request a quote — we'll scope your Martinez project and give you a fixed price.

Meeting-first estimates • Response within 24 hours • Serious projects only