ALTA/NSPS Surveys in San Francisco, CA
We prepare ALTA/NSPS Land Title Surveys for San Francisco commercial properties — office, multifamily, industrial, and development sites — to the 2021 Minimum Standard Detail Requirements, on the County Surveyor's CCSF-CS13 coordinate system.
ALTA/NSPS Surveys in San Francisco: Local Conditions
An ALTA survey in San Francisco is a records exercise as much as a field one. Because most public records before 1906 burned, the earliest surviving title documents for many blocks are the McEnerney decrees that re-established ownership after the fire, and the County Surveyor's subdivision regulations still point to them. Every boundary we resolve is tied to the city's monument lines — Public Works' map checklist requires at least two monument lines with two monuments each — and to CCSF-CS13, the coordinate system the County Surveyor requires as a basis of bearings. Where a transaction turns up a discrepancy between record and occupation, we can file a Record of Survey through the Bureau of Street-Use and Mapping, which reviews it before it is recorded with the Assessor-Recorder.
The city adds Table A wrinkles you will not see elsewhere. Bay windows, marquees, and other projections over the sidewalk are governed by Public Works' minor encroachment rules, so we locate them precisely against the property line and the right-of-way. Zoning is block-by-block under the Planning Code — height and bulk districts, special use districts, and neighborhood commercial overlays — so the zoning-classification item usually needs a zoning report plus our confirmation of setbacks and building footprint. Lenders on SoMa, Mission Bay, and Dogpatch properties routinely ask about the mapped liquefaction zone; we report the parcel's position against the state seismic hazard maps. Utilities, easements, and encroachments from adjoining zero-lot-line buildings are located and shown, and parking counts, building measurements, and square footages come straight from our laser scan of the site rather than from a tape.
Scanning is the practical advantage: a single visit documents the building envelope, parking, and site improvements for the ALTA, and the buyer's design team can reuse the same point cloud after closing for renovation or repositioning — see our San Francisco as-built surveys. We coordinate with the title company on the commitment and Schedule B exceptions, and deliver a certified plat, DWG, and the point cloud.
Full service details, process, and deliverables: ALTA/NSPS Land Title Surveys · All surveying in San Francisco: San Francisco land surveying
What's Included
- Built to the 2021 ALTA/NSPS Minimum Standard Detail Requirements
- All Table A optional items available (1–20, plus negotiated 21)
- Direct coordination with title officer for commitment exceptions
- Closing-driven scheduling with realistic turnaround commitments
- Underwriter-ready surveyor's certificate addressed to your stack
- Concurrent topo and existing-conditions capture when needed
Our Process
Order Intake & Title Review
We review the title commitment, legal description, prior survey (if any), lender requirements, and which Table A items the deal demands.
Research & Plat-of-Survey Setup
Record research, deed and easement analysis, plotting of Schedule B exceptions, and identification of the parties the certificate must be addressed to.
Field Survey
Boundary recovery, improvement and encroachment location, evidence of utilities and easements, and any Table A item that requires field measurement.
Drafting & Title Coordination
We plot Schedule B exceptions, note the survey's relationship to each, and circulate a draft to title and counsel for review before signing.
Signed & Sealed Delivery
Final wet-stamped plat with surveyor's certificate addressed per the title commitment, delivered as PDF and DWG in time for closing.
ALTA/NSPS Surveys in San Francisco: FAQ
ALTA/NSPS Surveys Across the East Bay
Need ALTA/NSPS Surveys in San Francisco?
Call (510) 543-2220 or request a quote — we'll scope your San Francisco project and give you a fixed price.
Meeting-first estimates • Response within 24 hours • Serious projects only