ALTA/NSPS Surveys in Concord, CA

We perform ALTA/NSPS Land Title Surveys across Concord, Contra Costa County's largest city, for office, retail, and industrial transactions from the downtown BART core to repositioning commercial corridors.

ALTA/NSPS Surveys in Concord: Local Conditions

Concord is the most active commercial transaction market we serve in Contra Costa County: office buildings around the downtown BART stations, retail centers along the major corridors, and an aging stock of commercial and industrial buildings that is steadily repositioning — each sale or refinance typically triggering an ALTA/NSPS Land Title Survey to the 2021 Minimum Standard Detail Requirements. Concord also carries a due-diligence fact the other cities on our list do not: the Concord fault crosses the city and is zoned under the Alquist-Priolo Earthquake Fault Zoning Act. The fault zone itself is a state geologic designation rather than a survey matter, but buyers and lenders routinely ask us to show the mapped zone boundary relative to the surveyed parcel as a negotiated detail, and it is worth knowing before the appraisal, not after.

Repositioning deals are where survey detail earns its fee. Concord's postwar commercial buildings have accumulated decades of additions, fence lines, shared driveways, and informal parking arrangements, and the 2021 standards require us to document that evidence of use and possession alongside the record boundary. We resolve title lines from recorded maps and deeds at the Contra Costa County Recorder and check our monument findings against the Contra Costa County Surveyor's records in Martinez, then plot every locatable Schedule B exception so the title officer can underwrite with a complete picture. Parcels near the former Concord Naval Weapons Station redevelopment area get particular scrutiny, since surrounding ownership and easement patterns there are actively changing.

Our Trimble terrestrial laser scanner captures a full retail center or industrial site — buildings, docks, striping, utility surface evidence — in one visit. Table A items 6(b), 7, 9, and 8 come straight out of the point cloud, and the cloud is reusable after closing for tenant improvement or scan-to-BIM work.

Full service details, process, and deliverables: ALTA/NSPS Land Title Surveys · All surveying in Concord: Concord land surveying

What's Included

  • Built to the 2021 ALTA/NSPS Minimum Standard Detail Requirements
  • All Table A optional items available (1–20, plus negotiated 21)
  • Direct coordination with title officer for commitment exceptions
  • Closing-driven scheduling with realistic turnaround commitments
  • Underwriter-ready surveyor's certificate addressed to your stack
  • Concurrent topo and existing-conditions capture when needed

Our Process

1

Order Intake & Title Review

We review the title commitment, legal description, prior survey (if any), lender requirements, and which Table A items the deal demands.

2

Research & Plat-of-Survey Setup

Record research, deed and easement analysis, plotting of Schedule B exceptions, and identification of the parties the certificate must be addressed to.

3

Field Survey

Boundary recovery, improvement and encroachment location, evidence of utilities and easements, and any Table A item that requires field measurement.

4

Drafting & Title Coordination

We plot Schedule B exceptions, note the survey's relationship to each, and circulate a draft to title and counsel for review before signing.

5

Signed & Sealed Delivery

Final wet-stamped plat with surveyor's certificate addressed per the title commitment, delivered as PDF and DWG in time for closing.

ALTA/NSPS Surveys in Concord: FAQ

The Alquist-Priolo zone along the Concord fault is a state geologic designation, not a boundary matter, so it does not change how we resolve title lines. But because the zone affects development potential and disclosure, many Concord buyers ask us to show the mapped zone boundary on the survey as a negotiated item — we recommend raising it with your title officer early.
The pacing items are the title commitment and the fieldwork. Once we have the commitment with Schedule B documents, our laser scanner captures even a large multi-tenant center in a single mobilization, so drafting and boundary resolution can begin immediately rather than waiting on repeat site visits for Table A measurements.
Postwar industrial parcels in Concord commonly show fence lines off the record boundary, shared or prescriptive driveway use, and utility evidence with no recorded easement behind it. The ALTA/NSPS 2021 standards require us to report exactly that kind of possession evidence, which is what protects a buyer from inheriting an undisclosed encroachment.

Need ALTA/NSPS Surveys in Concord?

Call (510) 543-2220 or request a quote — we'll scope your Concord project and give you a fixed price.

Meeting-first estimates • Response within 24 hours • Serious projects only