Bridge & Infrastructure Scanning in Moraga, CA

We provide control-network-tied scanning of bridges, culverts, and retaining structures in Moraga, Contra Costa County, covering creek crossings, storm drain structures, and trail bridges on the town's slide-prone terrain.

Bridge & Infrastructure Scanning in Moraga: Local Conditions

Moraga's structure problems are the ones that hit small towns hardest: a handful of aging bridges and a large buried drainage system, on ground that moves. The Canyon Road bridge over the West Branch of San Leandro Creek, built in 1936 at roughly 104 feet long and 24 feet wide, carried a sufficiency rating in the forties before the town moved to replace it with a wider clear span under the federal Highway Bridge Program route that Caltrans Local Assistance administers for city-owned structures. Underground, the failure mode is corrugated metal pipe: in March 2016 a 96-inch corrugated metal storm drain under the Rheem Boulevard and Center Street intersection lost the soil around it and the roadway collapsed, taking a signal pole and a utility vault with it, and roughly 130 feet of pipe was eventually replaced with reinforced concrete. Across town, the Lafayette-Moraga Regional Trail runs about seven and a half miles on the old Sacramento Northern right-of-way, crossing streets roughly a dozen times and the creek three, mostly parallel to Saint Mary's Road.

We scan that inventory tied to an observed control network: monuments set and measured with GNSS and total station, least-squares adjustment on NAD83 State Plane and NAVD88 with independent checks, every Trimble scan position registered in, and residuals reported. Bridges come back as deck, soffit, girder, abutment, and wingwall geometry with clearance computed across the full width and channel sections at the opening. Culverts come back as interior surfaces where they can be occupied, showing ovality, invert profile, and joint offsets, and as headwall and inlet geometry where they cannot. Retaining walls and the slopes behind them come back as continuous surfaces, and a repeat epoch differenced against the baseline turns suspicion of movement into a measured displacement map.

Deliverables are registered E57 or RCP clouds, DWG or DXF sections and profiles, clearance and ovality reports, and displacement maps. See infrastructure scanning, Moraga 3D scanning, and deformation monitoring.

Full service details, process, and deliverables: Bridge & Infrastructure Scanning · All surveying in Moraga: Moraga land surveying

What's Included

  • Control-network-tied scans with a stated, defensible accuracy
  • Vertical and horizontal clearance surveys from the point cloud
  • Structural as-builts of decks, soffits, bents, abutments, and bearings
  • Deformation baselines and repeat epochs for movement analysis
  • Rail, roadway, and utility corridor capture with minimal closures
  • Tanks, tunnels, and plant piping documented without contact
  • Deliverables in your agency CAD standard, NAD83/CSRC and NAVD88
  • Licensed surveyor responsible for control, datum, and certification

Our Process

1

Control & Access Plan

We design the control network, datum ties, scan positions, and traffic or rail access plan around the structure and its closure windows.

2

Control Survey

GNSS and total-station control is observed with redundancy and adjusted by least squares, producing published coordinates and error estimates.

3

Scanning

Trimble terrestrial laser scanning from the control, with targets and check shots, captures the structure at high density in short field windows.

4

Registration & Deliverables

Scans are registered to control, verified against checks, and processed into clearance reports, CAD, models, and comparison surfaces with an accuracy statement.

Bridge & Infrastructure Scanning in Moraga: FAQ

It can document the evidence, which is usually visible before the failure. A control-tied scan of the pavement surface, the wall, and the culvert ends records the geometry precisely enough that a later scan reveals settlement, a developing depression, or a shifted headwall as a surface difference of a fraction of an inch. Interior condition still needs CCTV or an inspector; the scan tells you where to look and how fast it is changing.
Existing conditions on a defensible datum, delivered in a form the design consultant can use. That is a control network tied to published stations with a documented least-squares adjustment, structure geometry, channel cross sections, approach roadway surfaces, and utility conflicts. We deliver the CAD and the registered cloud together so later sections come from the archive rather than another field visit.
In most cases yes. Each setup takes minutes and the instrument occupies a tripod footprint, so we work between users rather than against them and note anything obstructed. On a narrow crossing we may ask for brief courtesy holds, but a full closure is rarely necessary for a structure of that size.

Need Bridge & Infrastructure Scanning in Moraga?

Call (510) 543-2220 or request a quote — we'll scope your Moraga project and give you a fixed price.

Meeting-first estimates • Response within 24 hours • Serious projects only